First Op Session!

At 1:30pm today, engineer Vos (P), along with conductor Vos (D), started a shift at the State Belt enginehouse.   After a quick stop at the clerk’s office to pick up some B-7’s, the crew made their way to Pier 43, where they picked up 8 cars off an inbound Santa Fe car float.

Over the course of the next two hours, 9 cars were spotted at their destinations, and 10 cars were picked and delivered to their interchanges (9 for the next ATSF float and one shoved down to the SP interchange at King Street).

Operational difficulties were kept to a minimum.   The track crew will need to inspect a couple of turnouts, and the car maintenance crew will be busy as well, since the rolling stock fleet just came out of storage for the first time in 4 or 5 years.

Owner’s Notes

I wasn’t at all sure how quickly cars would be moved.   I’d prepared for 3 inbound float’s worth of cars, at 8 cars per float, along with around the same amount of work to be performed making pickups.

As it turns out, only one float’s worth of car were spotted over the course of about 2 hours.   That’s not disappointing at all; I honestly had no idea how long it would take.   It’ll be easier the next time, said one crew member, because the “start-up effort” of figuring out how things work will be reduced (provided he can remember from one session to the next).

But this session serves as the culmination of a lot of work to get to this point.   Benchwork, track laying, wiring, fascia controls, car movement paperwork, and more.   The next chunks of construction will go much faster, as I won’t have to do everything from scratch.    For example, the next track work will probably be the 3rd “main track” along the north part of Embarcadero, including the spurs off into the piers.   As each pier is set up, and the track laid, they’ll become operational very quickly since all of the power & DCC wiring is in place.   The notion of building upon what’s already there takes over.

So I’ve got some debugging to do on a couple of noted track locations.   And some tweaking on cars that have been in boxes for a long time.   Nothing too serious, and certainly nothing that will stop me from having additional op sessions over the next several months.

And continuing to do more construction as well.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s